Your technical arm against your own EPC.
Owner’s rep and independent oversight of your EPC, from plan review to closeout.
Where we engage
Our Scope, Stage by Stage
-
01
Evaluate & Diagnose
- EPC, PPA and lease technical terms review
- Site and technical feasibility
- Production modeling
- Utility program and incentive review
-
02
Engineer & Analyze
- Plan set reviews: 30/60/90%, IFP, IFC, as-built
- Constructability and code review
- P.E.-stamped plan sets
- Storage and microgrid integration studies
- Contractor submittal reviews for the owner
-
03
Permit & Interconnect
- Entitlement, permitting and interconnection risk and processing
- Interconnection application and utility coordination
- Safe harbor and BOC records review
-
04
Construction Oversight
- Owner’s rep and independent EPC / GC oversight
- Payment application review and draw sign-off
- QA/QC inspections and hold-point witnessing
- Change order review
- Safety audits
-
05
Commission & Verify
- Commissioning, or sign-off of the EPC’s docs
- Punch list, closeout and turnover verification
- Capacity test witness (ASTM E2848)
- Plant commissioning and testing processes and procedures
- Utility inspection and PTO support
-
06
Operate & Maintain
- Warranty-period inspections before the EPC warranty expires
- O&M scope and contract technical review
- Technical data room for asset sale
Not an exhaustive list. A scope of work is created specific to your project’s needs.
Technical analysis and diagnostics are performed nationally; licensed construction and remediation in California. Contract support is technical and commercial in nature; CNES does not provide legal advice.
How we check the EPC’s work.
Commissioning & Startup
Verifies the plant was built to spec.
- ASTM E2848 capacity test
- IEC 62446 commissioning verification
- Functional and integrated testing
Code & Compliance
Confirms the asset is lawful and financeable.
- NEC 690 / 705 PV wiring
- IEEE 1547 interconnection
- NFPA 855 / UL 9540A BESS fire
Electrical Testing
Finds the fault, not the symptom.
- IV curve tracing and string-level testing
- Insulation resistance (megger)
- Ground- and arc-fault location
Both sides of the EPC table.
Client names withheld; references on request. “Prior firm” items were delivered by CNES leadership before CNES existed.
- Founded and led a development and engineering platform
- 150 MW+ through design, structural and entitlement
- In-house rooftop racking system developed and deployed
- Interconnection across NEM, FiT and multi-state programs
- Construction and PM as Head of Construction and COO
- 2 GW+ / $3B+ delivered at a prior firm (leadership)Prior firm
Put an engineer on your side of the table.
Send the asset and the question. We’ll scope it.